Loading...
 

Exploded (production) parts list

Expanded (production) bill of materials

 

Description

This module is used to process order-specific production bills of materials. These are the bills of materials generated by the system by expanding master bills of materials, taking into account the characteristics and their values specified in a customer order, warehouse order or advance requirement. The term ‘expand’ refers here to the extraction of entries from, for example, variant BOM items, or to the calculation of quantities and/or characteristic values.

One particular point to note when maintaining these is that, in the so-called tree view of the bill of materials, the calculated total quantity is already displayed for each BOM item, even though only individual quantities are entered. If a quantity is changed at any level in the bill of materials, all quantities at the levels below are immediately updated automatically – that is, multiplied out – and the required total quantities are displayed.

ClassiX normally® assumes that at least a ‘rough’ variant bill of materials is defined for every part in the system. This prevents the need to define and enter a separate master bill of materials in advance for every special case. As part of technical processing and design, this order-specific production bill of materials is then adapted or refined in more detail with regard to parts, characteristic values and quantities. The changes are then only valid for the respective order item.

To create new bills of materials quickly, it is possible to drag a part from the parts master into the production bill of materials structure using the mouse. This means that only the quantity needs to be adjusted and, if necessary, the new item expanded (provided it is an assembly – red gear icon!).

In principle, however, you are able to completely redefine the order-specific production bill of materials from scratch.

Note: If, for example, within an order-specific production bill of materials – which was expanded or generated from a ‘standard’ bill of materials – you replace one part with another at any lower level of the structure, then this production bill of materials no longer ‘matches’ the original ‘standard’ bill of materials; in principle, this then constitutes a completely new assembly; generally speaking, all parent parts have thereby been redefined – even though they still retain their original part numbers in this production bill of materials. This approach should therefore only be used to respond quickly and pragmatically to any customer requests for (simple) ‘non-standard’ items (e.g. replacing screws with different head types).

As the production bills of materials are retained in the system, it is possible to trace at any time what was installed where; however, this always requires querying the sales order itself in the system.

It is therefore recommended that changes to production bills of materials are only made for variant parts (the ‘uniqueness’ of the bill of materials is in any case only ensured by the characteristic values defined in the sales order) and, where necessary, that a characteristic of such parts is marked with a version.

Please note:
Changes to the production bill of materials may result in the work plan for the parent part no longer matching the current production bill of materials. To identify these items, there is an option in the ‘View’ settings under the ‘Edit’ menu called‘Show number of entries (production bill of materials/master bill of materials)’.
If this option is selected, additional information is displayed after each line in the production BOM tree: (x/x). The first x represents the number of BOM entries in the expanded production BOM below this entry. The second ‘x’ stands for the number of BOM entries in the master BOM for this entry.
This allows you to identify major changes in the expanded production BOMs compared to the master BOMs.

Special work plan

A special work plan or one-off work plan can be stored for each item in an exploded production bill of materials; this is then used for the subsequent production order. Similarly, the total time of all work sequences from this special work plan is later used on the parts requisition as the lead time with which the initial scheduling is initiated.
Therefore, if a production part that has a master work plan spanning 9 days is supplemented with a special work plan of just one day, only one day will be scheduled for this item later in the parts requisition. It is therefore possible to adjust lead times in advance using special work plans.
Please note: If several BOM items are grouped together under the same part in the parts request, and a special work plan has been defined for just one of these BOM items, this special work plan will be used for all BOM items (due to the single parts request item comprising all identical parts!).

One-off work plan

If a work plan is to be defined at the time the production bill of materials is created, a one-off work plan can be created for each expanded production bill of materials item. This is a master work plan valid only for this sales order, which cannot subsequently be found via the normal master search.

To obtain an overview of all work plans / one-off work plans associated with a production bill of materials, you can choose to display the work plans in the tree view. A toolbar button featuring the work plan icon is provided above the tree for this purpose.

If you wish to extend or even create a one-off work plan, simply drag the work centre from the resource list onto the parent bill of materials item using the mouse. If a master special work plan was already linked to this bill of materials, this link will be broken and, following a confirmation prompt, a one-off work plan will be created. In this case, the work plan does not open in its entirety; instead, only its first item—containing the work centre dragged into the tree—opens. All that is required here is to fill in the details and save it; it will then also appear in the production bill of materials tree. One-off work plan items can be opened and edited directly by double-clicking. To prevent a global master work plan from being accidentally modified, this function is only permitted for one-off work plan items.

Design assembly

A component consists of several sub-assemblies to be assembled. In the exploded bill of materials, the sub-assemblies to be fitted can be seen beneath the main part.
However, the production department itself wishes to avoid the sub-steps involved in assembling and scheduling the sub-assemblies, and instead assemble them directly when the main part is being assembled. In such cases, the sub-assemblies are marked as ‘Design assembly’ in the bill of materials; this means that whilst the design department treats these parts as sub-assemblies, in production the sub-assemblies of the design assembly are all processed together without the design assemblies themselves. Production therefore sees this bill of materials as shown in Figure 3

The sub-parts of a design assembly contained in the exploded production bill of materials are moved up one level in the production order, as if the design assembly did not exist at all in the exploded BOM and all sub-parts of the design assembly were located directly at the position where the design assembly itself is situated.

Figure 1:

resolb2.JPG

Figure 2:
resolb3.JPG

Figure 3:
resolb4.JPG

The parts Test4 and Test5 are therefore moved below the top level; the design assembly is no longer taken into account. In this example, all parts are required at production level 1.

Planning assembly

When dealing with planning assemblies, a distinction must be made between two different scenarios:

  1. Loose part: A part which, although it actually belongs to an assembly, is to be installed at a different production stage.
  2. Purely planning assembly: A subset of parts that belong to an assembly but are to be planned collectively. A new part is inserted into the production bill of materials, which is not visible in the normal production bill of materials.

 

If a bill of materials is linked in a production role and an entry exists in the planning product structure, the specified part is ‘inserted’ beneath the production part on the entry in the planning product structure when the production bill of materials is exploded. All parts specified in the BOM item list for the purely MRP assembly are therefore moved from the parent BOM to below the new entry.

To create a purely planning-related assembly, start with the production role to which the part is to be inserted; create a purely planning-related entry there and select the bill of materials with its items from the parent bill of materials. This purely planning-related entry is then visible both in the original production role and in the production role of the part that has been inserted.

Please note!
A purely planning-related assembly is not visible in the standard production bill of materials display:

resolb5.JPGresolb6.JPGresolb7.JPG

The purely planning-related assembly “Test3” ultimately appears in the planning production structure. A parts requisition item is also created for this part. Parts cx0005 and cx0006 are then arranged below it.

A planning assembly defined by the master record is a production part that does not have its own bill of materials and, within another production part in the ‘planning product structure’ list, contains entries from other, higher-level bills of materials. (See here for the technical pattern) A condition can only be entered for entries in the planning product structure if the assembly is a purely planning-related assembly.
Further information on assembly bills of materials and purely planning-related assemblies

Modifying bills of materials that have already been processed

An important point here is that the immediately higher-level production order items must be reprinted after a bill of materials item has been added or deleted. To this end, a date is displayed on the production order item and on the header following the change, indicating that the production documents that have already been printed must be collected and reprinted/redistributed. This date can be seen in the second column of the production order editing screen and in the worklist. It disappears once the production documents have been ‘truly’ reprinted.

Adding BOM items

If a parts requisition for a bill of materials has already been created and processed, the corresponding bill of materials entries can no longer be amended.
However, new items can be inserted under ‘Production Order Bill of Materials Items’ if the parts requisition has not yet been released. If the parts request has already been released, the release must be revoked.
To insert an item into the bill of materials, select the bill of materials item below which a new item is to be inserted. In the context menu, which you open by right-clicking on the selected item, select the ‘Insert’ option. A confirmation prompt will appear, to which you must reply ‘YES’. The bill of materials item can now be created and edited in the usual way.

All parts included in the production bill of materials must be broken down if a production bill of materials exists for the part, even if this item is actually only intended to be placed on a purchase order. How the part is to be scheduled is set later in the parts requisition.

Once the bill of materials item is complete and is to be processed further, select the option “Edit->Latecomers->Extend parts requisition” from the main menu.
A new parts requisition item is created for each newly created bill of materials item (without merging with existing BOM items!!), which is immediately scheduled; that is, the new parts requisition item is assigned its standard scheduling type (stock reservation/purchase requisition/production order) and the lead time is calculated and saved based on this. Now the item simply needs to be scheduled and processed further via graphical scheduling from within the parts requisition: 

  • If the new item is a stock reservation, the stock reservation must first be cancelled via the menu option ‘Edit->Delete->Cancel stock reservation (all stock items)’. Subsequently, all items, including the new parts requisition item, can be re-entered via the menu option “Edit → Further Processing → Create Stock Reservation”.
  • If the new item is a purchase requisition, simply create a new requisition via the menu option “Edit → Further Processing → Latecomers → Create Further Purchase Requisition”, which automatically posts the parts requisition item.
  • If the new item is a production order, a new production order must also be created via the menu “Edit → Further Processing → Latecomers → Create Further Production Order”. The parts requisition item is now entered.

Once the relevant steps have been completed, the parts requisition must finally be released via the menu ‘Edit → Further Processing → Release Parts Requisition’.

Deleting BOM items

If a bill of materials item is to be deleted, this can also be done directly from within the bill of materials. However, the following conditions apply:

  • The ‘Release parts requisition’ flag must not be set
  • The parts requisition item associated with the bill of materials item to be deleted must not have the status ‘Production order’
  • Production orders can no longer be amended
  • All material requisitions that have already been created for the item to be deleted must be cancelled
  • The stock reservation in the parts requisition must be cancelled if a stock-managed part is to be removed
  • If there is an assigned advance requirement for this item, the advance requirement must be removed and, if necessary, the main MRP type must be changed.

The BOM items are deleted once the conditions have been checked, as are the associated parts requisition items, provided they are no longer required by other BOM items.
Exception:
If a cancelled follow-on document is already linked to the parts requisition for the BOM item to be deleted, then both the BOM item and the parts requisition item (if no longer required) are cancelled and marked with a red X in the BOM.

Known change scenarios

Here are instructions on exactly what to do when a change is to be made:

Type of change Procedure Alternative procedure
Replacing a BOM sub-item whose parts requisition is set to the planning type Stock reservation
  • Revoke the parts requisition release, if applicable
  • Delete the BOM item via the context menu – if the parts requisition item is then no longer required by any other BOM item, it will be deleted.
  • Insert a new bill of materials item at the desired position in the bill of materials tree
  • Use the menu “Edit> Restructure> Latecomers > Extend Parts Request” to create new parts request items for new bill of materials entries
  • Set a schedule for the new part in the parts requisition (double-click the item to open it, then use the “Edit> Dates> Set” menu to activate the date fields; next, enter the replenishment time in days and the dates, then save)
  • In the parts requisition, select “Further processing> Latecomers> Create further stock reservation”
  • Release the parts requisition
Replacing a BOM sub-item whose parts requisition is set to the MRP type Purchase Requisition
  • Cancel the parts requisition release, if applicable
  • Select the BOM item and, via the menu “Edit> Restructure> Advance Requirements > Move Selected Item to Advance Requirements”, remove the item from the BOM and move it to the newly created advance requirements for this sales order Insert the new BOM item at the desired position in the BOM tree
  • Use the menu “Edit> Restructure> Latecomers > Extend Parts Request” to create new parts request items for the new BOM entries
  • Carry out scheduling for the new part in the parts requisition (double-click the item to open it, then use the menu “Edit> Dates> Set” to activate the date fields; next, enter the replenishment lead time in days and the dates, then save)
  • In the parts requisition, use the menu “Edit> Further Processing> Latecomers > Create Further Purchase Requisition” to create a new purchase requisition
  • Release the parts requisition
  • Revoke the parts requisition approval, if applicable
  • Cancel existing purchase orders and purchase requisitions
  • Delete the BOM item via the context menu (it will be cancelled) – if the parts requisition item is no longer required by any other BOM item, it will be cancelled.
  • Insert a new BOM item at the desired position in the BOM tree
  • Create new parts requisition items for new BOM entries via the menu “Edit> Restructure> Latecomers > Extend Parts Requisition”
  • Create a new parts requisition in the parts requisition via the menu “Edit> Further Processing> Latecomers > Create Further Parts Requisition”
  • Release the parts requisition
  • Replace a BOM sub-item whose parts requisition is set to the MRP type Production Order
Cancel the parts requisition release, if applicable
  • Switch to the exploded production bill of materials (sales order bill of materials) via the document history
  • Select the BOM item and, via the menu “Edit> Restructure> Advance Requirements > Move Selected Item to Advance Requirements”, detach the item from the BOM and move it to the newly created advance requirements for this sales order
  • Insert a new BOM item at the desired position in the BOM tree
  • Expand the new BOM item
  • Use the menu ‘Edit> Restructure> Backlog > Extend Parts Request’ to create new parts request items for the new BOM entries
  • Schedule the new part in the parts requisition (double-click the item to open it, then use the menu “Edit> Dates> Set” to activate the date fields; next, enter the replenishment lead time in days and the dates, then save)
  • In the parts requisition, create a new production order via the menu “Edit> Further Processing> Backlog > Create Further Production Order”
  • Release the parts requisition
  • Revoke the parts requisition release, if applicable
  • Switch to the exploded production bill of materials (sales order bill of materials) via the document history
  • Select the bill of materials item and delete it via the context menu
  • Insert a new bill of materials item at the desired position in the bill of materials tree
  • Expand the new BOM item
  • Use the menu “Edit> Restructure> Backlog > Extend Parts Request” to create new parts request items for the new BOM entries
  • Schedule the new part in the parts requisition (double-click the item to open it, then use the ‘Edit> Dates> Set’ menu to activate the date fields; next, enter the replenishment lead time in days and the dates, then save)
  • In the parts requisition, create a new production order via the menu “Edit> Further Processing> Latecomers > Create Further Production Order”
  • Release the parts requisition
  • Delete a BOM item whose parts requisition is set to the MRP type Stock reservation
Revoke the parts requisition release, if applicable
  • Delete the bill of materials item via the context menu – if the parts requisition item is no longer required by any other bill of materials item, it will be deleted.
  • Release parts request
  • Please note: If a withdrawal has already been made for the stock reservation, neither the bill of materials item nor the parts request item will be deleted; instead, they will be automatically reversed using a reversal document. The parts request item then automatically changes to the ‘stopped’ status, as the quantity withdrawn must first be returned to stock. Once the stock has been returned to stock, the parts requisition item is then automatically set to the status “cancelled” (see also “List of amended parts requisitions”)

Deleting a bill of materials item whose parts requisition is set to the ‘Purchase requisition’ planning type
Revoke the parts requisition release, if applicable
  • Delete the requisition and purchase order (if possible. Otherwise, leave it as it is and inform the buyer that the order quantity must be reduced. If this is not possible either because the goods are already in transit, simply leave it as it is. The parts requisition will then be posted to ‘Stopped’ status after the bill of materials item has been deleted and must be processed via the list of amended parts requisitions (the remaining quantity must be put into stock or returned via a returns document).)
  • Select ‘Remove’ from the context menu for the bill of materials item; this will cancel it, along with the associated parts requisition item
  • Release the parts requisition
  • Please note: If the parts requisition comprises multiple sales orders, and provided the requirements requisition has been deleted, a new requirements requisition must be created via “Further processing> Latecomers> Create further purchase requisition” before the parts requisition is released! Only then can the parts requisition be released again!

Changing the part to a sales order item for production parts subject to MRP after exploding the bill of materials and further processing the parts requisition
Compare the exploded bill of materials with the structural master bill of materials for the part to be inserted
  • Cancel the parts requisition release, if applicable
  • In the new bill of materials, select the exploded BOM entries required and, via the menu “Edit> Conversion> Preliminary Requirements --> Move Selected Items to Preliminary Requirements”, move the item to the preliminary requirements for this sales order
  • Duplicate the sales order item in the order (Button via the item tree)
  • Cancel the old sales order item (in the sales order item window, select ‘Edit> Further Processing> Cancel Sales Order Item’)
  • New sales order item: Replace part with a new part, adjust material characteristics
  • New sales order item: Open the technical release window and release the item there (the bill of materials is exploded)
  • Create a parts requisition for the new sales order item => All items previously moved from the old bill of materials to preliminary requirements are now automatically linked to the parts requisition items of the new sales order items. Only those items not yet present in the old bill of materials need to be re-scheduled.
  •  
The bill of materials item does not need to be planned for the full quantity
Adjust the material withdrawal or requirements quantity (production order not yet possible) accordingly to the desired quantity
  • Cancel the parts requisition release
  • Cancel the stock reservation (if stock item)
  • Open the parts requisition item
  • Click the ‘Change quantity’ button and enter the new quantity
  • Save
  • Make a stock reservation (if stock item)
  • Release the parts requisition
  • Adjust the material withdrawal or requisition quantity (production order not yet possible) accordingly to the desired quantity
  • Cancel the parts requisition release
  • Select the parts requisition item and choose ‘Edit> Close item> Cancel remaining quantity’ from the menu
  • Release the parts requisition
  • The parts requisition item does not need to be scheduled in full, but already has booked successor items.
Withdraw the parts requisition
  • Carry out a (partial) cancellation (parts requisition context menu)
  • Partially issue the goods received and put the remaining quantity into stock (context menu in the goods issue from goods receipt)
 

Create a preliminary requirement for a part from a bill of materials

Using the menu “Edit> Preliminary Requirement> Create preliminary requirement for part from selected item”, a preliminary requirement item for the part can be created for the selected item. In doing so, all required attributes from the bill of materials or the sales order are transferred to the preliminary requirement. Furthermore, the required quantity and the sales order are transferred as the predecessor for the preliminary requirement header. Even if a production part from a bill of materials is transferred to a preliminary requirement, and this part has sub-parts which in turn require further attributes, these are transferred directly into the preliminary requirement item exactly as they were defined in the sales order or the bill of materials.

If the part for preliminary planning is a production part, the production bill of materials for this item is also copied. This ensures that any changes made to production bills of materials are also carried over into the preliminary requirements.

Extracting BOM nodes from the bill of materials into a preliminary requirement

If a customer requests changes affecting an order item that has already been processed, it may be necessary to change the main part on the order item. As this would alter the exploded bill of materials, and production orders, for example, may already have been created, this change can no longer be carried out. 

There are now two options available:
Cancel the entire order item and put parts that have already been requested into stock via the ‘Amended Parts Requests’ window, etc. Then create a new order item and restart all production orders from scratch.

  1. Move parts from the bill of materials that are also required in the new bill of materials to a preliminary requirement; then cancel the old order item, create a new order item, and the preliminary requirements from the old bill of materials will be automatically linked when the Gozintograph is created. This allows production order sub-items to be processed further.
  2. If you open the exploded bill of materials for the order item, a new menu option “Edit->Preliminary Requirements” becomes available. This contains two entries: “Move selected node to preliminary requirements” and “Move all sub-items of selected node to preliminary requirements”.

Warning!

Design assemblies will be exploded! This means that if you select a design assembly and choose the menu option “Move selected node to preliminary requirements”, it is not the design assembly itself that is moved to preliminary requirements, but only its sub-items that are not themselves design assemblies.
Only one preliminary requirements header is created for a bill of materials, which then contains all the sub-items created. It is possible to extend a preliminary requirements record that already exists for this sales order. To do this, the existing preliminary requirements record must be opened before expanding the bill of materials items. The system then checks whether the order header in the opened preliminary requirement is identical to that of the BOM item to be released; if not, a new preliminary requirement is created.

 

PLEASE NOTE: The post-calculated costs of the transferred items remain attached to the original order item! They are not transferred along with the items! It is therefore strongly recommended that components transferred to a preliminary requirement are used exclusively for the same sales order header; otherwise, the costs will be charged to the old sales order rather than the new one!

If components are to be transferred from one sales order to another, they should not be moved to a preliminary sales order in this way, but should instead be temporarily stored; that is, a stock-in entry should be created for the old sales order and a stock-out entry for the new sales order. This ensures that the costs are included in the new sales order whilst simultaneously offsetting the old sales order.  
PLEASE NOTE: In the preliminary requirement created, only those attributes are specified which are not defined in the transferred items, but which originate from a parent BOM item or from the order item.

Functionality

Maintenance window

Menu item

Description
Edit -
: Entries -
: : Edit The selected BOM entry can be edited.
: : Insert A new BOM entry is added to the selected BOM item.
: : Remove -
: : : Complete The selected BOM item and all its subordinate BOM items are removed (deleted).
If material requirements planning has already been carried out for the BOM item, it is not deleted but cancelled. A cancellation document is generated. Any goods that may already have been withdrawn must then be returned to stock via the“Change Management Closure” list. : : : Sub-structures only
All subordinate BOM items starting from the selected BOM item are removed. The selected BOM item itself remains unchanged.
If material requirements planning runs have already been carried out for the BOM items, they are not deleted but cancelled. Any goods that may already have been withdrawn must then be returned to stock via the “Change Management Closure” list. : : Edit referenced master BOM item
The corresponding item in the master BOM is opened for editing.
: : Display as list The BOM tree is displayed as a list.
: : Create preliminary requirements for part from selected item  
: : Completely disassemble part This is a shortcut to completely disassemble a part (see also Conversion BOM / Disassemble parts). This function is only available for internal sales orders.
This can be applied to Level 0 parts. In this process, the Level 0 part itself is re-inserted into the bill of materials. The part itself must be defined as a stock-managed production part (including manual stock, etc.), as this must be marked as a material withdrawal in production planning for disassembly. In addition, all sub-parts of the bill of materials are inserted into the production bill of materials and marked as ‘to be disassembled’. If a Level 1 part is selected because the part to be withdrawn from stock has already been inserted, only the final step is carried out.

: : Create a customer complaint from the selected item

: : Expand The selected bill of materials item is expanded. If a special bill of materials is specified for the item, this is expanded; otherwise, the standard bill of materials for the part is used.
During the breakdown, the system checks whether the part is a supplied part that is self-supplied. If so, the system checks whether the ‘Manufacture part yourself’ tick box is ticked or not on the broken-down BOM item. If it is ticked, the production BOM associated with the production role, or the specified special BOM, is exploded for the part. If not, the supplier-provided BOM from the specified supplier is exploded.

: : Explode from BOM master
Variant part with no master BOM, or with an empty master BOM:

Explode without master references (e.g. for unspecified variant parts)
If a variant part without a master bill of materials – or with an empty one – has been entered on a bill of materials item, it can be exploded using a template bill of materials. All items from the selected template bill of materials are then appended to this item.
References to master BOM or master BOM item objects are removed after expansion.

The advantage of this is that no master information from which this BOM was expanded is retained.
The bill of materials will, of course, be customised further and will probably have very little, if anything at all, in common with the sample bill of materials at a later stage – a reference, for example as a ‘special bill of materials’, would therefore be misleading.

: : Test: Attribute value
Any characteristic values can be tested for the selected BOM item. This allows you to check whether a characteristic is defined at this position at all, or what value that definition has. (Important for expanding the BOM from this item onwards.)

: : Test: Values – <-> –inherited values  
: Check BOM Calls the function to check the bill of materials.
: Test Gozintograph
: Restructuring -
: : Latecomers -
: : : Extend parts request  
: : Advance requirements -
: : : Move selected node to advance requirements The selected BOM node is removed from the original BOM and attached to a newly created advance requirement item for the same sales order. This allows components already manufactured from cancelled sales order BOMs to be reused for other sales order items within the same sales order.
See also “Release to preliminary requirements” : : : Move all sub-nodes of the selected node

to preliminary requirements

It is not the selected item, but all its sub-items that are moved to a preliminary requirement and thus removed from the original bill of materials.
: : Compare bill of materials with another bill of materials
See Bill of Materials Comparison
: Preliminary Planning
: : Create preliminary requirements for part from selected item Preliminary requirements are created for the selected part without moving the bill of materials item.
If this is a production part, the production bill of materials for this item is also copied. This ensures that any changes made to production bills of materials are also carried over into the preliminary requirements. : : Compare bill of materials with another bill of materials

Opens the bill of materials comparison window, in which exploded bills of materials can be compared with one another

: Import ELCAD bill of materials The BOM items exported from ELCAD to Excel are imported (inserted) into the BOM item previously selected in the tree. The Excel file is opened interactively; for security reasons, you must also confirm that you wish to insert the ELCAD items into the selected BOM item.
: Compare ELCAD BOM Import This function allows you to compare an ELCAD BOM that has already been imported with a new version of that list before the actual import takes place. To do this, select the parent node under which the ELCAD bill of materials has already been imported, then select this menu item. A file dialogue box appears, in which you must select the new ELCAD Excel file. Once selected, the ELCAD bill of materials is loaded into memory only, and the bill of materials comparison screen opens, displaying the old version on the left-hand side of the window and the newly loaded version of the ELCAD bill of materials structure on the right-hand side.
The differences are listed in the results list below both bills of materials. The results can also be displayed clearly as a tree structure using the ‘Analysis as Tree’ button. In this comparison, only the new and deleted bill of materials items are automatically displayed in the results list.
See also Bill of Materials Comparison
: Display Options

: : Display Number of Entries (Production BOM/Master BOM)
A value (x/x) is now displayed in the tree as the final column, indicating the current number of items below the selected node. This value consists of two figures: first that of the exploded production bill of materials, then that of the master bill of materials.
If, for a particular entry, the quantity before the ‘/’ differs significantly from that after it (e.g. 31/2), the work plan for that item should be checked. It will certainly no longer match the exploded production bill of materials. The work plan can only be modified once it has been expanded from the production order.
: : Displaying work plans
The work sequences of the items’ work plans are also displayed in the tree. Work sequences from standard work plans are displayed with the symbol
clock.png (grey). If a special work plan is assigned from the master data, the symbol clock_green.png (green) is displayed; if it is a one-off special work plan, the symbol clock_red.png (red)              If special or one-off work plans exist, these are displayed instead of the standard work plans. See <a>the One-off Work Plan</a> section for further information on the drag-and-drop options: Preliminary Costing

-
: : Calculate not enabled
: : Display not enabled
: Close Close window
Search Open selection window
Toolbar

Icon

Description
CX_PRINTER_hardcopy.png Output from the print preview window.
pin.png pinned.png
Create/edit<a>notes</a> copy.png Open clipboard
  			The copy buffer window opens, allowing you to insert selected BOM items via drag and drop. From this copy buffer, these BOM items can then also be inserted back into the BOM tree via drag and drop, whereby a copy is automatically created. list_view.png
Display BOM in list view
CX_ITEM_DEMAND.png Display planned product structure
tree.png Display document history
              The document history for a selected BOM item is displayed. CX_JOB_RECORD.png
Create a timesheet
              The timesheet form opens and is automatically pre-filled with the staff member and the predecessors – in this case, the bill of materials. CX_SORT.png
CX_SORT_disabled.png
The tree is displayed sorted by sub-item numbers. Clicking this button displays the list unsorted.CX_PURCHASE_INQUIRY_auto.png Create spare parts enquiry
              This button opens the module for automatically creating enquiries; the selected bill of materials item is transferred to the module. This tool enables you to automatically generate spare parts enquiries. CX_ACCESSORY_LIST.png
Create a packing list as a successor if a bill of materials item is to be delivered directly to the construction site.
In the tree view, bill of materials items can be freely moved within the bill of materials structure as long as they have not yet been processed further. Exceptions are purchase orders and stock parts: sub-items of these cannot be moved, as they are only held in stock or can only be ordered with their original bill of materials.

If a part has already been moved once, the original parent item is stored on it. This means it can also be removed from bills of materials for purchase order and stock parts if, for example, it was accidentally moved into them.

If a part cannot be moved successfully, the reason for this is displayed in the status bar of the window.

Maintenance window

In this window, the entries of a production bill of materials are maintained. In particular, you can replace the part and/or its bill of materials here, specify details regarding the planning structure and adjust quantities.


At the top-level BOM node, the system checks whether the BOM quantity matches the quantity of the preceding order item.

Attribute Maintenance
In addition to the ‘standard’ options for inserting, creating or removing attributes, further functions are available in the BOM item maintenance window.

Apply – All
This function applies all attributes of the part, provided it is a variant part. In this case, the system does not attempt to assign a value to the attribute that is derived from the production bill of materials or the predecessor document.

To avoid discrepancies, the values should therefore be ‘updated’ (see the ‘Update’ menu item below) Apply – Dynamic
This function adopts the attributes of a variant part that have not already been defined by the production bill of materials or the predecessor document.
Update This function updates the attribute values. A prerequisite is that the attribute has been defined in the production bill of materials or the predecessor document. It is recommended to use this function to avoid any discrepancies between two attribute values.
Test: Value <-> Inherited Values This function acts, so to speak, as a preview for the update. It displays the differences between the item’s attribute values and the values that are actually to be inherited.
Note: In a production bill of materials, the attributes do not refer to the same attributes at a higher level, as is the case in a sales order. You should therefore avoid inserting attributes that are already defined in the production bill of materials or the predecessor document.

Serial numbers
The serial numbers used in the bill of materials items are displayed here. In particular, the serial numbers assigned by the Supplier must be recorded here, as these parts do not appear in any production order. The following menu options are available for editing serial numbers via the bill of materials:

Insert
A serial number label can be selected via the selection screen.

Manual entry New serial numbers are entered via the serial number label edit screen. The part of the bill of materials item and the item itself are transferred to the edit screen, so that only the serial number needs to be entered here.
Remove Removes the serial number label from the bill of materials item.
Enter serial number for Supplier This entry method is the most effective way to enter a Supplier’s serial number for a bill of materials item. The first step is to select the supplier using the relevant button. When the supplier selection screen opens, all suppliers from whom the part has previously been ordered via ClassiX® , although other suppliers may also be selected. The next step is to enter the serial number in the relevant field. Once a purchase order is submitted, the serial number is created immediately, displayed as an object in the relevant field, and the input field is reset. This allows the next number to be entered straight away if the item consists of more than one unit.
Menu
Menu item

Description

Edit
- : Insert part
- : : Via selection mask
: : Via preliminary requirements
: Quantity correction
- : : Insert
: : Delete
  : Serial numbers
- : : Insert
A serial number label can be selected via the selection mask. : : Manual entry
New serial numbers are entered via the edit mask for serial number labels. The part of the bill of materials item and the item itself are transferred to the edit screen, so that only the serial number needs to be entered here. : : Remove
Removes the serial number label from the bill of materials item. : Attributes
- : : Copy characteristics
- : : : All
This function copies all attributes of the part, provided it is a variant part. It does not attempt to assign a value to the attribute that is derived from the production bill of materials or the preceding document. To avoid discrepancies, the values should therefore be ‘updated’.
: : : Dynamic This function adopts the attributes of a variant part that have not already been defined by the production bill of materials or the predecessor document.
: : Update attribute values
This function updates the attribute values. A prerequisite is that the attribute has been defined in the production bill of materials or the predecessor document. It is recommended to use this function to ensure there are no discrepancies between two attribute values. : : Test: Values ‘ <-> ’ inherited values
This function acts, so to speak, as a preview of the update. It displays the differences between the item’s attribute values and the values that are actually to be inherited. : Close
Close window
Fields Field

Description

Number
Part
Selected part Index
Version of the bill of materials. When expanding production bills of materials, this index is written from the master bill of materials to the expanded bill of materials item. This ensures that it is still possible to trace later which index (revision) was used to expand the bill of materials. An index can also be specified on the master bill of materials items. If this is left blank, the system checks when expanding the production bill of materials whether the part at the bill of materials item has its own bill of materials with an index. This is then transferred to the exploded item. Dismantle part
This item is removed from an existing component and placed into stock! See conversion bills of materials Standard bill of materials
Standard bill of materials for the part Special bill of materials
Selection and display of the special bill of materials assigned to the bill of materials item. Usually, the standard bill of materials for the part is expanded and used as is. However, if there are special circumstances – for example, where a customer always wants a particular part to have specific features that cannot be represented using variant bills of materials (as these are ‘too exotic’) – the special bill of materials can be assigned to the part here.
A rule of thumb for using special bills of materials is: the standard bill of materials is used in 80 per cent of cases, whilst special bills of materials are used in 20 per cent. If the special bill of materials is used in more than 20 per cent of cases, it makes sense to integrate the special features into the standard bill of materials as a variant. Any exploded bill of materials can still be modified at a later stage. However, the exploded bill of materials will then differ from the master bill of materials, for which the corresponding work plan was also created. This renders the work plan inaccurate; therefore, any significant changes to the exploded bill of materials must always be made in consultation with production planning so that the work plan can be adjusted if necessary.

Standard work plan

Standard work plan for the part

Special work plan

Selection and display of the special work plan assigned to the BOM item. If this is a special work plan that does not exist in the master work plans and is not intended to be available as a master work plan, you can create your own local work plan directly. You can edit your own local work plan using the right mouse button.
When a special work plan is assigned from the master data, the icon clock_green.png

(green); if it is a one-off special work plan, the icon

clock_red.png (red) is displayedManufacture the part yourselfIt is also possible, for purchased parts supplied in-house and production rolls, to expand the bill of materials for the production roll and manufacture the part yourself. To do this, tick the ‘Manufacture part yourself’ box on the expanded BOM item for the purchased part supplied in-house.  			Any sub-items that may already have been created through the automatic explosion of the supplier-provided BOM must first be deleted (open the context menu on the purchased part with the self-supplied item, then> Remove> Sub-structures only).
When the BOM item is exploded again, the production BOM is then exploded and, in Gozinto, the sub-parts are not marked as supplied parts; furthermore, the purchased part with self-supply is not scheduled as a purchase requisition but as a production part. Spare Parts List

If this tick box is ticked, this BOM item – regardless of the master BOM item from which it may have been generated – will be recognised as a spare part when a spare parts list is created and will be included in it.

Supplier of provided parts

For purchased parts with self-supply, it is necessary to know, at the time the bill of materials is exploded, from which supplier this item is to be ordered. This is because the parts required for this supplier to provide are included in the bill of materials based on the supplier specified here. If this field is not filled in for logistically defined purchased parts with self-supply, the Gozintograph cannot be generated and testing will result in an error message. Further information on suppliers providing parts in the logistics account, supplier agreement bills of materials and the in-house supply process description.
Planned product structure This field allows the open item in the exploded production bill of materials to be moved to a higher production level within the bill of materials. This may be the case if a part is actually intended to be attached to a sub-assembly, but for practical reasons it can only be fitted once the entire component has been completed (because it may have a longer lead time and production still needs to begin beforehand). Hence the name ‘planning-based’ product structure. This means you can start assembling the sub-assembly without having to wait for the long-lead-time part to be scheduled.

See also ‘planning-based product structure’ and ‘purely planning-based assembly’.

In the production bill of materials, only a ‘loose’ assembly can be defined; that is, an assembly can be moved from a lower level to a higher or lower level. Purely planning assemblies can no longer be formed in the exploded bill of materials; that is to say, a component that is not visible in the normal exploded bill of materials view, but which appears in production as a separate production order, can no longer be retroactively incorporated into the exploded bill of materials after a master bill of materials has been exploded.
: Design assembly

If the assembly is marked as ‘design-related’, it will not appear in the parts requisition itself, and all its sub-items will be scheduled one level higher. In the production bill of materials, therefore, the structure defined by this assembly is still visible, even though it does not exist later in production.

: MRP usage

Quantities
- : Fixed quantity
: Quantity
  Characteristics
List of attributes Serial numbers
- : Enter serial number
: : for Supplier
This entry method is the most effective way of entering the Supplier’s serial number for a bill of materials item. The first step is to select the supplier using the relevant button. When the supplier selection screen opens, all suppliers from whom the part has previously been ordered via ClassiX® , although other suppliers may also be selected. The next step is to enter the serial number in the relevant field. Once the purchase order is submitted, the serial number is created immediately, displayed as an object in the relevant field, and the input field is reset. This allows the next number to be entered straight away if the item consists of more than one piece.
Note
Buttons Button

Description

OK
Changes to the production bill of materials entry are saved. If no changes have been made, the button is disabled. Close
The window is closed without saving any changes. If you wish to save the changes, you must click the ‘OK’ button.
Selection window In this window, you can search for production bills of materials that have already been exploded.

Search fields

Field

Description

Number
Search by number  
Buttons Button

Description

OK
The selected exploded production bill of materials is applied. Close
The selection is cancelled.
List window This window displays exploded production bills of materials in list form rather than in a tree structure. If you double-click an entry in the list, you are taken directly back to the selected bill of materials item in the tree structure. Right-clicking opens the maintenance window for the selected BOM item.

Selection fields

Field

Description

Depth
The structure depth of the BOM to be listed can be selected. If nothing is specified, the entire BOM structure is displayed Show only BOMs for production parts subject to MRP
In principle, all existing BOMs are always exploded. If, for example, a part was once an in-house manufactured part, its BOM is very likely still present in the system; this BOM is included in the breakdown – even if the part is now a purchased part. For stock-managed production parts, the bills of materials are also expanded, even if these parts are not manufactured to order but are taken directly from stock. To filter out the bills of materials for such parts, you must tick this checkbox. Then, the bill of materials will only be displayed for those parts which – if no parts planning has yet been carried out - have been marked as a production part subject to material requirements planning in the parts master according to the standard logistics and provisioning codes, or - if material planning has already been carried out, provided the option to override the planning identifier is available – have been marked as production parts in the planning process.
If this checkbox is ticked, the next checkbox, ‘Proof of Origin’, appears; otherwise, it remains hidden. Proof of Origin

If the option ‘Expand bills of materials for production parts subject to material planning only’ is selected, it is still possible to display the purchased parts for stock-managed production parts. This provides a list showing all purchased parts, regardless of whether they are yet to be installed in a production part subject to material planning production part or have already been incorporated into a stock-managed production part.

 

BOM Check Result This window displays the result when the “Check BOM” function is called from the production BOM editing window. However, the check is also carried out immediately after the production BOM has been created (expanded).

The list shows the BOM items for which the check has resulted in an error or a warning message.

The following cases are checked:

There is a BOM item without an assignment to a part.

There is a BOM item assigned to an invalid part without a replacement object.

The part status has the indicator ‘Addition to BOM prohibited’ (see Attributes with control function)

  1. The part status has the indicator ‘Warning when adding to BOM’ (see Attributes with control function)
  2.  
  3. BOM comparison
  4. This application allows you to compare one exploded BOM with another. The similarities and differences are displayed in the results list.

Example

The customer places a purchase order for a clockwise-rotating unit. The purchase order is released, the production bill of materials is exploded and production is started. After some of the unit’s components have already been completed, the customer gets in touch, apologises and now requests a left-rotating system. In this specific example, the procedure would be a new order item is created for the left-rotating system and its production BOM is exploded. The two production BOMs are then compared using the BOM comparison function to identify the identical and differing components.

Accessing the BOM comparison

There are two ways to access the BOM comparison. Firstly, within an existing production BOM, you can select the menu option ‘Edit -> Modify -> Compare BOM with another BOM’. In the example above, you would do this from the bill of materials for the right-rotating system. The bill of materials is then adopted as the source bill of materials. When calling it up manually, a blank screen opens and the source bill of materials must be selected manually via the selection screen for order items.

The next step is to select the target bill of materials. This is also done via the order item selection screen or by dragging and dropping the order item.

Finally, click the ‘Start comparison’ button on the toolbar to start the comparison.

Evaluation of the bill of materials comparison

The results of the comparison now appear in the results list at the bottom of the window. The first column in this list shows the type of result:

Result

Description

Found

‘Found’ means that the bill of materials item is present in both bills of materials. The items are identical in terms of the part, the attributes and the quantities. Further processing if necessary:
Continuing with the example above (change made by the customer) these found BOM items from the source BOM can be used in the target BOM. To do this, the part can, for example, be moved to a preliminary requirement via the menu. When production for the new plant starts, this component is then automatically linked to the production order that has already been started. Found (differing attributes)

This result can only be achieved if the option “Disable attribute value comparison’ has been set via the options screen. With this option selected, the result means that the variant part has been found, but the attributes differ. In the results list, the attributes of the source BOM item and the target BOM item can be compared in the following columns.
Found (differing quantities)

This result means that, although the bill of materials item was found in both the source and target bills of materials, the quantities have changed. In the results list, the quantities of the source and target bill of materials items can be compared in the following columns. The quantity comparison always refers to a reference quantity. The quantity is therefore always compared in relation to the quantity of the Level 0 part.
New Entry exists in the target bill of materials but not in the source bill of materials

Omitted

The item was present in the source bill of materials but is no longer required in the new bill of materials. Omitted, but contains the found object
The item was present in the sourcebill of materials and is no longer present as such. However, it continues to be used in the target bill of materials as sub-items of the source bill of materials. Navigation
If a result list entry is double-clicked, the associated bill of materials items in both trees, if present, are highlighted. Thus, if you double-click an entry beginning with “Found”, the first occurrence of this part is displayed in both bills of materials.
You can also use the context menu on the two BOM trees to navigate to the other BOM and to the results window. See the ‘Menu’ description below.

Menu
Menu item

Description

Results list entries
- : Move all selected items to a preliminary requirement
Moves all BOMs selected in the results list from the source BOM to a new preliminary requirement. See also “Expand into preliminary requirement” : Open the searched-for bill of materials
Opens the edit screen for the exploded BOM item in the source bill of materials to which the results list entry refers. If none exists, nothing happens. : Open the found bill of materials
Opens the editing screen for the exploded BOM item in the target BOM to which the result list entry refers. If none exists, nothing happens. Source BOM
- : Show selected item in results list
Searches the results list for the entry corresponding to the selected source BOM and highlights it. This allows you to check whether an entry for this item has been found in the comparison BOM or not. : Show selected item in new results list/tree view
The selected item is displayed in a separate window with a tree view. : Show only direct sub-items of the selected item in new results list
Only the BOM entries at the next lower level are displayed in a separate window, both as a list and in a tree view. : Mark found part in target bill of materials
If the selected part from the source bill of materials was also found in the target bill of materials, the part is marked here as well. The tree is expanded as far as necessary for this purpose. : Further processing
: : Advance requirements
- : : : Move selected node to advance requirements
The selected BOM node is removed from the source BOM and attached to a newly created advance requirements item for the same sales order. This allows components already manufactured from cancelled sales order BOMs to be reused for other sales order items within the same sales order. See also “Release to preliminary requirements”
: : : All sub-nodes of the selected node        Move to preliminary requirements Not the selected item, but all its sub-items are moved to preliminary requirements and are therefore removed from the original bill of materials.

: : Remove

-
: : : Completely
The selected bill of materials item is removed (deleted) along with all its subordinate bill of materials items.
If material requirements planning runs have already been carried out for the BOM item, it is not deleted but cancelled. Any goods that may already have been withdrawn must then be returned to stock via the ‘Change Management Closure’ list. : : : Sub-structures only
All subordinate bill of materials items starting from the selected bill of materials item are removed. The selected bill of materials item itself remains intact. If MRP runs have already been carried out for the BOM items, they are not deleted but cancelled. Any goods that may already have been withdrawn must then be returned to stock via the “Change Management Completion” list.
: Open BOM item edit window
Opens the editing screen for the selected, exploded BOM item in the target BOM. Target BOM
: Create preliminary requirement for part from selected item A preliminary requirement is created for the selected part without moving the BOM item
: Show selected item in results list Searches the results list for the entry matching the selected target bill of materials and highlights it. This allows you to check whether an entry for this item also existed in the source bill of materials or not.
: Highlight the part found in the original bill of materials If the highlighted part from the target bill of materials is also found in the source bill of materials, the part is highlighted here as well. The tree is expanded as far as necessary for this purpose.
: Open theediting window Opens the editing screen for the selected, expanded bill of materials item in the target bill of materials.
Fields
Field Description

Source bill of materials

-
Document history button Opens the document history of the BOM item selected in the tree
Source The predecessor order item of the BOM that is to be compared with another BOM. This BOM is regarded as the origin for the comparison. If this bill of materials contains parts that are not included in the target bill of materials, these parts are treated as omitted.
Any object with an expanded bill of materials can be dragged into this list as a successor using the mouse. The comparison is carried out via the ‘Start Comparison’ button on the toolbar. BOM tree
Once the comparison has been started, the source BOM is displayed as a tree in this window. Via the menu, items in this BOM can also be cancelled, removed or moved to a preliminary requirement. Target Bill of Materials

-

Document History button Opens the document history for the BOM item selected in the tree
Source The predecessor order item of the target bill of materials, against which the initial bill of materials is compared. It represents the target state in the comparison. If it contains parts that were not included in the initial bill of materials, these parts are considered ‘New’. To view new parts in the results list, the “New” tick box above the results list must be selected. The analysis is only restarted and the result displayed the first time this option is selected.
Any object with an expanded bill of materials can be dragged into this list as a successor using the mouse. The evaluation is carried out via the “Start comparison” button on the toolbar. Bill of Materials Tree
Once the evaluation has been started, the target bill of materials is displayed as a tree in this window. You can navigate through this bill of materials via the menu and create a preliminary requirements list. A cancellation scenario is not provided for the target bill of materials. Results

 

Hide unchanged sub-items If this box is ticked, all sub-entries of items that have been found in full or omitted entirely are removed from the results list.
New If this box is ticked, the results list will also display entries that were found only in the target-state bill of materials and were therefore not present in the original bill of materials. The evaluation of the new entries takes a little longer, which is why this option is disabled by default.
Found If this box is ticked, all entries in the results list that appear in both the original and target bills of materials will be displayed.
Omitted If this box is ticked, parts from the source bill of materials that are no longer present in the target bill of materials will be displayed in the results list.
List Results list. This displays all results of the comparison between the two expanded bills of materials, which can be filtered using the options. This list can be copied to the clipboard using the ‘Copy to Clipboard’ toolbar button and exported to Excel via the clipboard.
Status bar  
: Analysis as a tree Opens the entire source bill of materials as a tree containing only the results of the comparison. This allows you to see exactly under which component parts have been added or removed. See also Tree view
Toolbar
Icon Description

CX_AMOUNT_calculation.png

Start comparison – Starts the comparison between the exploded bills of materials for the two selected order items. The result is entered into the results list

copytoclipboard.png Copy results list to clipboard. Opens the copy window, where a report can also be created or selected for printing.
 BOM comparison – Options
This options window allows you to configure advanced settings for the BOM comparison. Fields

Option

Description

Depth

Bills of materials are only compared up to the depth defined here.
Disable attribute value comparison With this option, identical variant parts are already regarded as matching bill of materials items, regardless of the specifications in the two bill of materials items. If the specifications differ, this is indicated in the result.
Tree view of comparison results
Menu Entry

Description

Show sub-items of the selected list item

All directly subordinate result list entries are displayed in the list for the currently selected result list entry.
Fields Entry
Description List
The results list containing only the desired entries. Double-clicking an entry displays it in the adjacent tree
Tree view The tree view of the desired result entries. Here, you can clearly see which entries are new and which have been omitted.
Related topics
Index Work plan

Test Breakdown

Bill of Materials


Implementation

Quality Assurance

Amount Structure

<a>Resolved Allocation Base Module</a>

Module Name

resolved.mod

CX PRODUCT AMOUNT En

Classes

CX_ALLOCATION_TXN

Security

In addition to restricting access rights via the class and its data fields, the module’s use can be restricted via some of the messages it receives.

Received Messages

Message

Parameter

Function

Security
RESOLVED_ALLOCATION_CHANGED Resolved Allocation Object Resolved allocation has been changed
RESOLVED_ALLOCATION_CREATED Resolved allocation object Resolved allocation was created
RESOLVED_ALLOCATION_DELETED Resolved allocation object Resolved allocation was deleted  
Messages sent Message Parameter

Function

Receiving module
EDIT_RESOLVED_ALLOCATION NULL or resolved allocation object Call up input window for resolved allocation Resolved allocation edit module
Resolved allocation edit module Module name resoledt.mod

Classes

CX_ALLOCATION_TXN

Security

In addition to restricting access rights via the class and its data fields, the module’s use can be restricted via some of the messages it receives.

Received messages

Message

Parameter

Function

Security
ATTRIBUTE_SELECTED  
COMMENT_CHANGED Object Comment has been changed
EDIT_RESOLVED_ALLOCATION NULL or resolved allocation object Open the input window for resolved allocation
EDIT_RESOLVED_ALLOCATION_ENTRY
LIST_RESOLVED_ALLOCATION Collection of resolved allocationor NULL Call up the list window for resolved allocation
LOAD_RESOLVED_ALLOCATION Import resolved allocation  
RESOLVED_ALLOCATION_CHANGED Resolved allocation object Resolved allocation has been changed  
RESOLVED_ALLOCATION_CREATED Resolved allocation object Resolved allocation was created
RESOLVED_ALLOCATION_DELETED Resolved allocation object Resolved allocation has been deleted
RESOLVED_ALLOCATION_ENTRY_CHANGED
RESOLVED_ALLOCATION_INSERTED  
Messages sent Message Parameter

Function

Receiving module
ASK_YES_NO  
EDIT_COMMENT Object Open comment input window Comment editing module
EDIT_RESOLVED_ALLOCATION NULL or resolved allocation object Open the input window for resolved allocation Resolved allocation editing module
EDIT_RESOLVED_ALLOCATION_ENTRY  
LIST_RESOLVED_ALLOCATION Open the list window for resolved allocations Resolved allocation edit module
RESOLVED_ALLOCATION_CHANGED Resolved allocation object Resolved allocation has been changed
RESOLVED_ALLOCATION_CREATED Resolved allocation object Resolved allocation has been created  
RESOLVED_ALLOCATION_DELETED Resolved allocation object Resolved allocation has been deleted
RESOLVED_ALLOCATION_ENTRY_CHANGED  
SELECT_ATTRIBUTE
SELECT_PRODUCT
SHOW_PREVIEW Widget Print preview Print preview
SHOW_TXN_HISTORY
Resolved bill of materials editing module Module name resolbom.mod

Classes

CX_ALLOCATION_TXN

Security

In addition to restricting access rights via the class and its data fields, the module’s use can be restricted via some of the messages it receives.

Received messages

Message

Parameter

Function

Security
ATTRIBUTE_SELECTED
BILL_OF_MATERIAL_SELECTED  
COMMENT_CHANGED Object Comment has been changed
EDIT_RESOLVED_ALLOCATION NULL or resolved allocation object Open the input window for resolved allocation  
EDIT_RESOLVED_ALLOCATION_ENTRY
EDIT_RESOLVED_BOM  
EDIT_RESOLVED_BOM_ENTRY
ITEM_SELECTED
LIST_RESOLVED_ALLOCATION Collection of resolved allocation objects or NULL Open the list window for resolved allocations
LOAD_RESOLVED_ALLOCATION Import resolved allocation  
RESOLVED_ALLOCATION_CHANGED Resolved allocation object Resolved allocation has been changed
RESOLVED_ALLOCATION_CREATED Resolved allocation object Resolved allocation has been created
RESOLVED_ALLOCATION_DELETED Resolved allocation object Resolved allocation has been deleted  
RESOLVED_ALLOCATION_ENTRY_CHANGED
RESOLVED_ALLOCATION_INSERTED  
RESOLVED_BOM_ENTRY_CHANGED
Messages sent Message Parameter

Function

Receiving module
ASK_YES_NO
EDIT_COMMENT Object Open comment input window Comment editing module
EDIT_RESOLVED_ALLOCATION NULL or resolved allocation object Open input window for resolved allocation Resolved allocation editing module
EDIT_RESOLVED_ALLOCATION_ENTRY  
EDIT_RESOLVED_BOM_ENTRY
LIST_RESOLVED_ALLOCATION Open the list window for resolved allocation Resolved Allocation Edit Module
RESOLVED_ALLOCATION_CHANGED Resolved Allocation Object Resolved Allocation has been changed
RESOLVED_ALLOCATION_CREATED Resolved allocation object Resolved allocation has been created
RESOLVED_ALLOCATION_DELETED Resolved allocation object Resolved allocation has been deleted  
RESOLVED_ALLOCATION_ENTRY_CHANGED
RESOLVED_BOM_ENTRY_CHANGED
SELECT_ATTRIBUTE  
SELECT_BILL_OF_MATERIAL
SELECT_ITEM
SELECT_PRODUCT  
SHOW_PREVIEW Widget Print preview Print preview
SHOW_TXN_HISTORY
Resolved work plan editing module Module name resoljob.mod

Classes

CX_ALLOCATION_TXN

Security

In addition to restricting access rights via the class and its data fields, the module’s use can be restricted via some of the messages it receives.

Received Messages

Message

Parameter

Function

Security
ATTRIBUTE_SELECTED
COMMENT_CHANGED Object Comment has been changed  
EDIT_RESOLVED_ALLOCATION NULL or resolved allocation object Open the input window for the resolved allocation
EDIT_RESOLVED_ALLOCATION_ENTRY  
EDIT_RESOLVED_JOB
EDIT_RESOLVED_JOB_ENTRY  
LIST_RESOLVED_ALLOCATION Collection of resolved allocation objects or NULL Open the list window for resolved allocation
LOAD_RESOLVED_ALLOCATION   Import resolved allocation
RESOLVED_ALLOCATION_CHANGED Resolved allocation object Resolved allocation has been changed  
RESOLVED_ALLOCATION_CREATED Resolved allocation object Resolved allocation was created
RESOLVED_ALLOCATION_DELETED Resolved allocation object Resolved allocation has been deleted
RESOLVED_ALLOCATION_ENTRY_CHANGED
RESOLVED_ALLOCATION_INSERTED  
RESOLVED_JOB_ENTRY_CHANGED
WORK_STATION_SELECTED  
Messages sent Message Parameter

Function

Receiving module
ASK_YES_NO  
EDIT_COMMENT Object Open comment input window Comment editing module
EDIT_RESOLVED_ALLOCATION NULL or resolved allocation object Open input window for resolved allocation Resolved allocation editing module
EDIT_RESOLVED_ALLOCATION_ENTRY  
EDIT_RESOLVED_JOB_ENTRY
LIST_RESOLVED_ALLOCATION Open the list window for resolved allocation Resolved allocation edit module
RESOLVED_ALLOCATION_CHANGED Resolved allocation object Resolved allocation has been changed
RESOLVED_ALLOCATION_CREATED Resolved allocation object Resolved allocation has been created
RESOLVED_ALLOCATION_DELETED Resolved allocation object Resolved allocation has been deleted  
RESOLVED_ALLOCATION_ENTRY_CHANGED
RESOLVED_JOB_ENTRY_CHANGED
SELECT_ATTRIBUTE  
SELECT_PRODUCT
SELECT_WORK_STATION
SHOW_PREVIEW Widget Print preview Print preview
SHOW_TXN_HISTORY
Resolved Allocation Selection Module Module name resolsel.mod

Classes

CX_ALLOCATION_TXN

Security

In addition to restricting access rights via the class and its data fields, the module’s use can be restricted via some of the messages it receives.

Received Messages

Message

Parameter

Function

Security
RESOLVED_ALLOCATION_CHANGED Resolved Allocation Object Resolved allocation has been changed
RESOLVED_ALLOCATION_CREATED Resolved allocation object Resolved allocation was created
RESOLVED_ALLOCATION_DELETED Resolved allocation object Resolved allocation was deleted  
SELECT_RESOLVED_ALLOCATION Collection of resolved allocation objects or NULL; recipient of the response Call up the selection window for resolved allocation
Sent messages Message Parameter

Function

Receiving module
EDIT_RESOLVED_ALLOCATION NULL or resolved allocation object Open the input window for resolved allocation Resolved Allocation edit module
RESOLVED_ALLOCATION_SELECTED Resolved Allocation object, recipient Resolved Allocation has been selected  
Resolved BOMs App Module name resolvedBOMList.app

Security

In addition to restricting access rights via the class and its data fields, the module’s use can be restricted via some of the messages it receives.

Received messages

Message

Parameter

Function

Security
LIST_RESOLVED_BOM  
Messages Sent Message Parameter

Function

Receiving Module
CREATE_NEW_SALES_RETURN_AUTOMATICALLY  
DELETE_RESOLVED_BOM_ITEM
EDIT_BILL_OF_MATERIAL  
EDIT_DISPO_ACCOUNT
EDIT_ITEM
EDIT_JOB_SCHEDULE  
EDIT_OBJECT
EDIT_RESOLVED_BOM
EDIT_RESOLVED_BOM_ENTRY
EDIT_STOCK_ACCOUNT
LIST_ITEM_STOCK_SUB_MONITORS  
LIST_RESOLVED_BOM
LIST_TRANSACTION_HISTORY
PRINT_ITEM_LABEL  
PRINT_REPORT
RESOLVE_RESOLVED_BOM_ITEM
SELECT
  {{%%!1287!%%}} {{%%!1288!%%}} {{%%!1289!%%}}

{{%%!1290!%%}}

Operational business