Cost unit (project)

Sales cost unit (project)

Description

Along with cost types and cost centres, cost objects are part of cost accounting. However, the term cost object is also used synonymously with the term sales opportunity (marketing/sales), the term framework agreement (purchasing) and the term internal cost object (e.g. R&D), depending on the specialist area. A cost object thus describes a business object to which a wide variety of inventory objects and a wide variety of documents can be assigned.

The documents assigned to a cost object, i.e. the documents posted with a cost object can also contain costs/services. Thus, costs/services can be assigned to a cost object either directly via financial accounting or via special (cost) documents (e.g. time sheets).

A (specialised) sales cost unit can be assigned inventory data of a plant (industrial plant, machine, part (e.g. for development projects)) and/or a business partner(customer, interested party, operator) or an operative partner(interested party, operator).

Transaction data such as offers or orders can also be assigned to a sales cost unit. In this case, a "project" is thus the superordinate node for various offer or order documents. Usually at the beginning of a quotation or order processing there is the definition of a project, with specification of the external and internal project manager, the assignment to a plant and possibly also the determination of a first rough cost framework(order/sales planning) and a time schedule(network), which can be imported directly from a planning by means of MS-Projects and can also be reconciled with it.

Using certain buttons in the toolbar, quotations and orders can therefore be created directly from a sales cost unit.

Functionality

Framework contracts and call orders

Blanket orders can also be defined above a sales cost object. The sales cost object takes over the definition of the outline agreement, for example, the partner and the contract period are defined. The "Framework contract data" tab is used to define the items, the total quantity agreed in each case and the price negotiated (project price). For this purpose the module of customer agreements is used.

The call-off orders are recorded as normal sales orders, which are assigned to the outline agreement as cost objects. The creation of a call-off order is initiated via the sales cost object. For this purpose, the articles which are called off by the customer are selected in the list. Then the sales order with the order items is created via the context menu "Create call order". The respective quantity called off and the delivery date must be entered in the order item.

In the customer agreement, the order items called up are listed in the "Receipts" tab. In addition, the quantity called off is displayed in the tab "Framework agreement".

Input window

This window is used for maintaining sales cost objects. You can select a sales cost object by entering the desired number in the Number field and confirming with RETURN. If you want to call up the list window, you can select the menu item "Search". The editing mask consists of the tab for entering the project data, the tab for displaying additional data for the project, the tab for displaying the documents assigned to the project, the tab for editing the framework agreement data and the tab for editing the documents and/or other associations assigned to a project.

Menu
Menu itemDescription
Edit -
: Search terms-
: : InsertInsert search term
: : RemoveRemove selected search term
Create new cost unitClears the input window for creating a new cost unit
Save cost unitSaves the currently displayed cost unit
: Delete cost unitDeletes the currently displayed cost unit
Print, fax, e-mail...-
: : printPrints the currently displayed cost unit
: : Print (own process)Prints the currently displayed cost unit in a separate process.
: Attachment-
: : Insert industrial plantInsert an industrial plant as an attachment
: : Insert machineInserting a machine as a plant
: : Insert vehicleInsert a vehicle as an attachment
: : Insert partInsert a part as an attachment
: : RemoveRemove selected entry from the plant list
: : Create
: : : Create industrial plantCreating a new industrial plant from the project data. The descriptions, the partner and the operator are taken over. If the operational partner is an interested party in the project, the operator role is searched for or, if not available, created. This operator role is then also entered as an operative partner.
: : Select locationSelecting a node from the "LAND_OF_INSTALLATION" folder
: : Open project search (for system)Opens the project search with the data of the selected plant and project
: : Open plant masterOpens the window for selecting an industrial plant
: External business partner-
: : CustomerSelection of a customer as external business partner
: : interested partySelection of an interested party as external business partner
: : operatorSelection of an operator as external business partner
: : unknown partnerCreating a one-time address as a business partner. Without creating a partner the name and address can be entered.
: External operational partner-
: : OperatorSelection of an operator as external operational partner
: : interested partySelection of an interested party as external operative partner
: External planner-
: : ConsultantSelection of a consultant as external planner
: : OperatorSelection of an operator as external planner
: : ClientsSelection of a customer as external planner
: : interested partySelection of an interested party as external planner
: Cost unit-
: : cost unit cost balancesCalling up the display of the periodised cost balances of the cost unit (from the operational accounting)
: : Cost unit totals listCalling up the cost unit totals list (from the operating accounting)
: : Cost unit cost overviewCalling up the display of the cost unit cost overview
: : Display cost unit hierarchyCalling up the display of the hierarchy of the cost unit
: : Cost unit cost balancesCalling up the display of the cost unit's cost balances
: : Cost element evaluation per cost unitCalling up the evaluation of the cost unit costs by cost element (from operational accounting)
: : Display cost unit related stock movements.Calling up the display of the cost unit's stock movements.
: : Display the stock related to the cost unitCalling up the display of the stock of the cost unit
: Subordinate cost unit-
: : Insert subordinate cost unitThe cost unit selection window opens. Selected cost units are inserted at "Contains" in the organisation chart.
: : Delete subordinate cost unitThe selected cost unit is deleted from the "Includes" section of the organisation chart.
: Project costs according to article groupsCall for the evaluation of project costs by item group (from rough planning, offers and orders)
Open project searchOpens the project search
: Further processing-
: : Create hourly time sheetsCreates a new time sheet and enters the cost unit there. Documents without a predecessor, which are posted to the cost object, can later be viewed in the document list of the cost object.
: : Create assembly proofCreates a new assembly proof and enters the cost unit there. Receipts without predecessors that are posted to the cost unit can be viewed afterwards in the cost unit's receipt list.
: : Create new order/sales planningCreates a new order/sales plan and enters the cost unit there. Documents without predecessors that are posted to the cost unit can be viewed afterwards in the cost unit's document list.
: : Create new budget offer per sample offerCreates a new budget quotation per sample quotation and enters the cost unit there. Documents without predecessors that are posted to the cost unit can be viewed afterwards in the cost unit's document list.
: Create new offer per sample offerCreates a new quotation by sample quotation and enters the cost unit there. Documents without predecessors that are posted to the cost unit can be viewed afterwards in the cost unit's document list.
: Create new tenderCreates a new tender and enters the cost object there. Documents without predecessors that are posted to the cost object can subsequently be viewed in the cost object's document list.
: Create new budget tenderCreates a new budget offer and enters the cost unit there. Documents without predecessors that are posted to the cost unit can be viewed afterwards in the cost unit's document list.
: Create new offerCreates a new offer and enters the cost unit there. Documents without predecessors that are posted to the cost unit can be viewed afterwards in the cost unit's document list.
: : Create new orderCreates a new order and enters the cost unit there. Documents without predecessors that are posted to the cost object can be viewed afterwards in the cost object's document list.
: : Create new order + service callCreates a new order with a service item and enters the cost unit there. Documents without predecessors that are posted to the cost unit can be viewed afterwards in the cost unit's document list.
: : Create internal orderCreates a new internal order and enters the cost unit there. Documents without predecessors that are posted to the cost unit can be viewed afterwards in the cost unit's document list.
: : Create work order for projectCreates a work order and enters the cost object there. Documents without predecessors that are posted to the cost object can be viewed afterwards in the cost object's document list.
: Create intercompany invoiceA simplified collective invoice is created for the total volume for all selected intercompany orders.
See also Intercompany orders
: : Further processing (documents/status)-
: : : Offer ended (lost)To note that the offer was not successful.
: attributesInsert, remove and create attributes
: conditionsInsert, remove and create conditions
: networksA project network can be created and edited for the cost unit
: NotesEdit notes
: ValiditySet validity
: Open task folderOpen the task folder for the cost unit
: CloseClose window
SearchCall up list window

Toolbar
SymbolDescription
new.pngThe input window is cleared for the entry of a new cost unit
save.pngSaving the cost unit data
delete.pngDeleting the cost unit
CX_OUTPUT.pngPrint the cost unit
CX_PRINTER_hardcopy.pngPrintout of the care mask of the cost unit
CX_VALIDITY.pngMaintaining the validity of the cost unit
CX_FINANCIAL_ACCOUNT.pngDisplay of the periodised cost balances of the cost unit
CX_AMOUNT_calculation.pngCalling the cost element evaluation for the cost object
CX_STOCK_log.pngDisplay of stock movements for the cost unit
CX_STOCK_on.pngDisplay of the stock for the cost unit
CX_PROCEEDINGS.pngDisplay the operation folders of the cost unit.
CX_INDUSTRIAL_PLANT.pngListing of the asset master
pin.pngpinned.pngCreate/edit notes
CX_SALES_ORDER_FORECAST.pngNew order/sales planning for the cost unit
CX_SAMPLE_QUOTATION.pngCreation of a new budget offer for the project using a sample offer
CX_SAMPLE_QUOTATION.pngCreation of a new offer for the project using a sample offer (see also previous entry)
CX_SALE_BY_TENDER.pngNew creation of an alert
CX_BUDGET_OFFER.pngCreation of a new budget offer for the project
CX_OFFER.pngCreation of a new offer for the project.

The system checks how many plant groups are attached to a plant assigned to the project. If there are more than one, then a list of all asset groups appears first, from which you can now select for which the order or the offer is to be created. If there is only one, it is selected automatically. All infrastructure data of the industrial plant are then taken over in the new offer/order, an item with the plant group is created and the characteristics are also inserted for this from the plant group master.

In the order/quotation header, the cost unit is transferred with all data resulting from this project.
CX_SALES_ORDER.pngCreation of a new order for the project (see also previous entry)
CX_SERVICE_INQUIRY.pngCreation of a new order with service visit
CX_STOCK_ORDER.pngNew creation of a stock order
helmet_yellow.pngNew creation of a work order
tree_view.pngShow hierarchy of the cost unit
gantt.pngAssign project network

Fields

FieldDescription
Project data-
: NumberNumber of the cost object/project
: short termShort name or short description of the project
: descriptionDescription of the project
: categoryStructuring of the project within the classification term with the identification COST_OBJECTIVE_CATEGORY.
: business areaBusiness field of the project
: dateDate of the last change can be stored here.
: typeType of project. Corresponds to the offer or order type when entering an offer/order.
: Search termsThe following data of a cost unit are automatically created as search term of the object: The number, the first line of the short term and the first line of the description. You can manually change these search terms, add new ones or remove some
: statusStatus of the project
: Attachment InformationIn this group information can be assigned to the cost unit of an industrial plant, machine, etc. If this is not the case, the installation site and industry can be stored.
: : AnnexAssignment to an industrial plant. If no business partner and/or operative partner has yet been created in the cost object, the operator (for the business partner only the customer function if available!) of the inserted industrial plant, machine etc. is taken over.
: : Site of installationIf no industrial plant can be assigned to the project, for example because it is not yet known, the plant can be assigned to an installation site and an industry. This is useful when projects are created to capture a market potential.

Installation sites can be defined via the evaluation group with the identification LAND_OF_INSTALLATION. For the industries, the generic classification key with the identification INDUSTRIES is used in the system.

: : Branch
: External projectAssignment of a commercial and operative partner for the cost unit.
: : Business Partner
: : : PartnerAssignment to a partner, which can be the operator of the industrial plant, a customer, an interested party or an unknown partner (not yet recorded in the system). The partner specified in this field is regarded as the actual business partner in the further course of a quotation or order processing. (see below for operative partner).

This means that when a quotation or order is created from a cost object, the customer role of the partner specified here is used. If the partner does not yet have a customer function when an order is created, the system prompts you to create one first.

: : : Project managerProject manager of the partner

: : : CX_PROCEEDINGS_new.png

Generate activity document for the project manager. The activity document is automatically posted in the activity folder of the project.
: : : Unknown partnerEnter address data for the "unknown partner".
: : : ContactsAssign contact data to the cost object. Customers, contact persons, employees, companies and persons can be added.
: : Operational Partner
: : : PartnerSelection of an operator or interested party for the operational handling of the cost unit. In addition to the actual business partner (see above under business partners), it is often desired to include data on the partners who are or will be ultimately operationally active in the project. This is the case, for example, if the business partner is a dealer, but the operative partner will then be the actual operator of a plant, machine or measuring instrument.
: : : Project managerProject manager of the operator

: : : CX_PROCEEDINGS_new.png

Generate activity document for the project manager. The activity document is automatically posted in the activity folder of the project.
: Project implementation (external)In this group the external project implementation is indicated
: : Plannersassignment to the planner of the industrial installation, who may be the operator of the industrial installation, a customer or an interested party. If it is an internal (development) project, these fields can also be left blank
: : Project managerProject manager of the planner

: : CX_PROCEEDINGS_new.png

Generate activity document for the project manager. The activity document is automatically posted in the activity folder of the project.
: Project implementation (internal)This group will indicate the internal implementation of the project
: : Techn. editorEmployee who is internally responsible for the project. This employee is included as a technical processor in a quotation or order if these are created via the cost unit. With the order term "TECHNICAL_STAFF_MEMBER" employees can be defined, which are automatically loaded into the selection list of the field. This facilitates the selection of an agent.
: : : Purchasing agent Sales staff responsible for the project. This can also be a contact person if an employee of an affiliated company is commissioned with the internal project implementation. This person will be included in a quotation or order as a commercial agent if these are prepared via the cost unit. With the order term "SALES_STAFF_MEMBER" employees can be defined, which are automatically loaded into the selection list of the field. This facilitates the selection of an agent.
: : : Purchase Assi.Administrative sales staff for the project. This allows you to define a contact person who is not responsible, but is responsible for monitoring deliveries or creating documents. This contact person will be included as a commercial assistant in a quotation or order if these are created via the cost unit.
: : Cost centreAssignment of the project to a cost centre
: : StartInternal start of the project, a period such as October 2005 or 1st quarter 2006 can be specified. This date defines when the first activities for the project will be carried out. This starts internally with the preparation of the offer. The probable order date and the order probability can be defined via the order/sales planning.
: : EndEnd of the project. A time period can also be specified here. Once a project is completed, no more documents should be assigned
: : stored goods as project warehouseThe stock for ordered and stored goods for a project is managed separately in the warehouse, i.e. these quantities are not available for planning, they must first be posted from the project warehouse to the planning warehouse by transfer posting. Transfer postings can also be made from one project warehouse directly to another project warehouse.
: : Goods belongs to projectIf this option is selected, the project stock is not listed in the general warehouse statistics. A separate warehouse statistic is created for the project.
Additional data-
CreatedDate on which the insurance provider voucher was created
: by employeesUser who created the insurance provider document
: Organization Chart-
: : : Belongs toOutput of the higher-level cost unit. With a right mouse click in this field you can switch to the superior cost unit. The originally edited insurance provider can then be found again in the "Contains" list.
: : ContainsOutput of the subordinate cost objects. With a right mouse click a cost object can be inserted or deleted via the context menu. You can switch to the subordinate cost object with a double click.
: Warranty-
: : Earliest warranty startDate on which the warranty for the entire project begins
: : : End of warranty at the latestDate on which the warranty for the entire project ends
: FeaturesThis is where the characteristics that describe the project in more detail are recorded. This could be, for example, the attribute "country", which could be used to define variant parts of an order assigned to the project
Receipts-
: Receipts
: : Last documentDocument that was last generated for the cost objects
: : Document listThe documents assigned to a project are displayed in this list. Double-clicking on a list entry takes you directly to the document.

Intercompany orders

Intercompany orders are listed in the same way as customer orders. As these intercompany orders are only billed at intervals by collective invoice, the list provides a clear identification of those intercompany orders that can be billed, those that have been billed, or those that have not yet been delivered and therefore cannot yet be billed. This overview is displayed by means of coloured pictures next to the status:

stopsign.png - the internal order has not yet been delivered and therefore not yet released for invoicing.
check_green.png - invoiced

go.png - after delivery note creation and booking
check_green.png - after invoice creation

Framework contract data
: Contract data
: : Your signThe reference data of the customer who ordered the framework agreement.
: : Order date
: Project agreements (project prices)In this list, project agreements can be made with regard to sales item roles and conditions. So if other prices are negotiated for this project in addition to the usual customer conditions (maintenance contracts...), the customer agreements can be overwritten with these. If conditions are specified in this window, only these conditions will be copied into an order for this project.
: ConditionsConditions that are only applied to sales orders that are created for this project.
If conditions are specified in this window, only these are transferred to an order for this project; no further search is made in the client (document settings), customer or user.
Coupled purchase contractsHere the purchase contracts are displayed and assigned, which were concluded with the suppliers as a result of the project.

Documents/associations
: Structure treeUsing the structure tree on the left side, subfolders or subnodes(CX_STRUCTURE.png) can be created. Associations (document references, parts, part roles, partner roles, etc.) can be moved within the structure via drag & drop and thus structured. In addition, it is possible to navigate via the structure tree to display the associations of the folder in the right-hand list.

It is possible to create a structure "COST_OBJECTIVE_ASSOCIATIONS" in the order terms. This is then used as a template and is automatically copied when a new project is created. In this way the assignment of documents to projects can be better standardised.

(Currently, only document references can be structured).

: ListOn the right side is the list of document references. The local document references are marked with the box symbol (CX_DOCUMENT_INDEX_LOCAL.png) and the global ones with the document reference icon (CX_DOCUMENT_INDEX.png) is displayed. In addition, global document references can also be inserted as a conditional table. Of the associated documents, the description of the document reference is displayed next to the type. This can be either the short title in the operating language or the description text. In addition, the type and the file name are displayed.

link: Description of the buttons for maintaining the assignments to the document references

Description of structure nodeFor the folder (structure nodes) defined in the structure tree, a different description can be entered here and saved using the save button to the right of the field.
Buttons
buttonDescription
Features
CreateOpens the context menu for creating features
InsertOpens the context menu for inserting features
RemoveRemoves the selected features from the list
Framework contract data
InsertOpens the context menu for inserting project agreements or the window for selecting contracts
RemoveRemoves the selected project agreements/EK contracts from the list.
Conditions
CreateOpens the context menu for creating conditions
InsertOpens the context menu for inserting conditions
RemoveRemoves the selected conditions from the list
Documents
OpenOpens the document of the selected document reference in the preview. Depending on the file type, Adobe Acrobat Reader, Word or, for example, Internet Explorer is started.
InsertWhen inserting, you can choose between local document references and global document references.
Context menu
Global document reference
SelectUsing the selection mask of the document references, an existing global document reference can be selected from the master data and associated with the object.
: CreateA new global document reference is created and directly associated with the object.
Conditional tableAn existing global document reference can be selected via the selection mask of the document references. This document reference is then the first entry of a conditional table, which is associated with the object.
Local document reference
File (storage in database)A file can be selected, which is created as a local document reference and associated with the object. The file is imported and saved in the database.
: Email - Outlook import (storage in database)The e-mail marked in Outlook is created as a local document reference and associated with the object. The email is imported and saved in the database.
: Email attachment - Outlook import (storage in database)The attachment of the e-mail marked in Outlook is created as a local document reference and associated with the object. The attachment is imported and saved in the database.
: File (reference)A file can be selected. The path to this file is stored in the local document reference. The document is therefore not saved in the database, but the document reference refers to the original document.
: Email - Outlook Import (storage in directory)When this function is called, the e-mail marked in Outlook is saved in a directory (server directory). The file name and directory are defined by the user by means of a query. A local document reference is then automatically generated which refers to the saved email.
: Email attachment - Outlook Import (storage in directory)When this function is called up, the file attachment of the email marked in Outlook is saved in a directory (server reference). The file name and the directory are defined by the user by means of a query, whereby the file name is preset on the basis of the attachment. Subsequently, a local document reference is automatically created, which refers to the saved file.

If the marked email has several attachments, one of the attachments must be selected by a user query.

EditThe document reference can be edited in its edit screen.
RemoveIf a global document reference is selected, the link between the document reference and the part is broken. Local document references are deleted.
Action
BackThe input window is closed.
DeleteThe displayed cost unit is deleted
NewThe input window is cleared for the entry of a new cost unit
SaveChanges to the cost unit are saved. If no changes have been made, the button is locked.

Change sales cost unit settings with Wizzard

With this wizard, settings can be set for a group of selected sales cost objects in one. The selection of the sales cost objects can still be changed while the wizard is open.

The checkboxes in front of the groups "Category", "Status", "Business field" and "Type" can be used to show or hide the data fields. Data fields that are shown are changed in the sales cost units by the Wizzard. These groups are not changed by hiding them.

Fields
FieldDescription
Category Edit the category of the sales cost unit.
: : CategoryStructuring of the project within the classification term with the identification COST_OBJECTIVE_CATEGORY.
: StatusEdit the status of the sales cost object.
: : StatusStatus of the project
: Business fieldProcessing of the business area of the sales cost unit.
: : Business fieldBusiness segment for the statistical analysis of sales.
SpeciesEdit the sales cost object type
: : SpeciesSales cost unit type

Buttons
buttonDescription
BackThe window is closed without saving the settings.
SaveThe settings are saved in the selected sales cost units.

List window

Serves to search and list cost units.

Menu
Menu itemDescription
Edit -
: Search-
: : Perform multiple searchPerform multiple search:
All fields marked in blue are included in this search.
With the multiple search it is possible to search for several criteria at the same time.
: : Reset listReset cost unit list
: Create new cost unitCreate new cost unit
Edit cost objectThe selected cost unit is opened in the input window.
: Delete cost unitOne or more selected cost units are deleted without prompting.
Print cost unit listThe printer selection window opens to print the displayed cost unit list.
: ValidityOpens the validity window of the object. Here the object can be set to invalid or provided with a replacement object.
Open process folderThe transaction folder with the documents for the selected cost unit is opened.
Edit industrial plant from plant masterThe selection window for industrial plants is opened in order to be able to open a plant for processing.
Copy all objects to the clipboardCopy list with cost units to clipboard
: Open WizzardCall up the cost unit wizard to automatically create projects and SOFs (order/sales planning documents) using an Excel template.
: CloseThe window is closed
Project-
: Change project categoryA new category to be selected can be specified for the insurance providers selected in the list
: Remove project categoryFor the insurance providers selected in the list, the respective category is removed
: Change project statusA new status to be selected can be specified for the insurance providers selected in the list
: Remove project statusFor the insurance providers selected in the list, the status assigned to them is removed
Change project start dateA new date/period can be entered as project start for the cost units selected in the list
: Change project endA new date/period can be entered as the end of the project for the insurance providers selected in the list
: Create project info Project information is created for the cost units selected in the list
: Change VK cost unit settings with WizzardCall the data entry wizard for quick entry of cost object data such as category, status, business field and type.
Navigate -
: Last offerThe last offer of the insurance provider selected in the list is called
: Last transaction documentThe last activity document of the cost object selected in the list is called up
: Next transaction documentThe next activity document of the cost object selected in the list is called up.
Lists -
: Open saved listThe selection window for Saved Lists is displayed to open a list
Save current listThe current cost unit list is saved
: Delete saved listThe selection window for saved lists is displayed for deleting a list
Cost -
Cost unit cost balancesThe period balance window for the cost unit account is opened
Cost unit cost overviewThe cost overview for the project opens
Stock-
Display cost unit related stock movementsThe stock movements for the cost unit are displayed
Display cost unit related stockThe stock for the cost object is displayed
Options Call up the option window

Toolbar
SymbolDescription
CX_AMOUNT_calculation.pngStart search. All blue fields for the selection of cost objects are included.
list_clear.pngReset cost unit list
new.pngCreate new cost objects
open.pngEdit cost unit
delete.pngDelete cost unit
CX_PRINTER_hardcopy.pngPrint insurance provider list
CX_VALIDITY.pngEdit validity
list_load.pngLoad cost unit list
list_save.pngSave the current cost unit list.
list_load_delete.pngDelete a saved cost object list.
CX_FINANCIAL_ACCOUNT.pngDisplay of the periodised cost balances of the cost unit
CX_COSTS_BOOKING.pngDisplay of the cost overview of the cost unit
CX_STOCK_log.pngDisplay cost unit related stock movements
CX_STOCK_on.pngDisplay cost unit related stock
CX_PROCEEDINGS.pngOpen transaction folder with documents
CX_INDUSTRIAL_PLANT.pngEdit industrial plant from plant master
copytoclipboard.pngCopy to clipboard

Search fields
FieldDescription
Project-
: NumberSearch for cost units by number. You can search with a single number or with a range from - to
: short termSearch for cost units using the short term
: Search termThere are two ways to search for search terms. In the simple search, you simply enter the character string to be searched for in the corresponding field and trigger the search. In the multiple search, this is then combined directly with the other search arguments if necessary.

You can access the advanced search via the button selectbtn.png in the list window. In this window you have several possibilities to search by the search term. After triggering the search in this special application, the result is transferred to the project list. Via a query ("Show result directly or include in multiple search?") the user can now decide how to continue. In the case of direct display, the list of projects is filled directly with the projects, otherwise each further multiple search is merged with the hits already found. Via the context menu in the selectbtn.png button to restore the initial state

: Industrial plantVia the button selectbtn.png opens the selection window for industrial plants. After you have selected a plant, cost units with this plant are searched for directly and displayed in the list.
Classification-
CategoryA category can be selected with the button selectbtn.png can be selected. If you want to select the insurance providers according to this category only, click search.png .
: StatusStatuses can be set with the button selectbtn.png selected or selected in the list (also several times). (The statuses displayed in the list are sorted according to their respective identification number , i.e. the sequence can be changed by maintaining this ID correctly).
If you only want to select the cost units according to the selected status, click on search.png .
Partner-
: Commercial agentSearch for the editor. With the button selectbtn.png you can select whether you are looking for the commercial, technical or processing staff. Now the person can be selected. If you want to select the cost objects only with the person in the relevant function, click search.png .
: BP: CustomerSearch for the business partner. With the button selectbtn.png you can choose whether to search for a customer, prospective customer, operator (by company role) or directly for a company. Now the partner can be selected. If you want to select the insurance providers only by this business partner, click on search.png .
: OP: OperatorSearch for the operational partner. With the button selectbtn.png you can choose whether to search for an interested party or operator. Now the partner can be selected. If you want to select the cost objects only by this operative partner, click on search.png .
: Search termThe search term is used to display all insurance providers who have saved the search term as a partner, business partner or operative partner.
Date-
CreatedSearch for insurance providers created on a specific date or date range.
: StartSearch for cost units that are to start or have started on a specific date or date range.
: EndSearch for insurance providers that are to be or have been closed on a specific date or date range.
Type-
: without/ with orderOnly select cost objects that have a sales order as successor or not.

Buttons
ButtonDescription
BackThe window is closed.
DeleteThe selected cost unit is deleted
NewThe input window for entering a new cost unit is displayed
EditThe input window for editing the selected cost unit is displayed

Status

The status of the insurance provider defines the different statuses that an insurance provider can have.

The status is defined via the evaluation group "COST_OBJECTIVE_STATE". This evaluation group can contain both simple structure nodes and structure statuses . In the case of structure status, the status is automatically determined by transition conditions in further structure statuses.

All simple structure nodes are displayed for selection and the structure statuses are displayed at the beginning of the status chain. Thus, for example, the structure term "COST_OBJECTIVE_STATE" could be structured as follows:

- Completed
- Releases

In this example, the statuses FINISHED and RELEASED can be set in the cost object by the user.

FINISHED blocks the complete processing of the cost unit. No additional data can be added to the cost unit. Existing data cannot be edited.

RELEASED releases the processing of the cost unit. Additional data can be added to the cost unit. Existing data can be edited.

Costobjectivestate En

Options for the processing and use of the parts can be stored at the individual statuses. These options are stored as attributes at the structure node (see also Attributes/characteristics and in particular the paragraph: Attributes with control function).

OptionAttributeControl system
Editing is blockedlockEditingProcessing of the cost unit is blocked. No data can be changed in the project data.
Blocking of bookingslockForLinkThe following actions concerning the blocked cost object are terminated with a message:
- Create new order / sales planning
- Create new budget offer
- Create new quotation
- Creating a new job
- Create new order + service call

- Create internal order for project
- Create time sheets
- Create assembly proof
- Create work order
- Create internal order
- Goods receipts
- Putaway
- Removal from storage
Blocking of offers and orderspre.lockForLinkNo new offers and orders can be created for the project.

Selection window

This window is used to select an insurance provider.

Menu
Menu itemDescription
Edit -
: Search-
: : Perform multiple searchPerform multiple search:
All fields marked in blue are included in this search.
With the multiple search it is possible to search for several criteria at the same time.
: : Reset listReset cost unit list
Options Call up the option window

Toolbar
IconDescription
CX_AMOUNT_calculation.pngStart search. All blue fields for the selection of cost units are taken into account.
list_clear.pngReset cost unit list

Search fields

FieldDescription
Project-
: numberSearch for cost units by number. It is possible to search with a single number or with a from - to range
: short termSearch for a cost unit using the short term
: search termThere are two ways to search for search terms. In the simple search, you simply enter the character string to be searched for in the corresponding field and trigger the search. In the multiple search, this is then combined directly with the other search arguments, if necessary.

The advanced search can be accessed via the button selectbtn.png in the list window. In this window, you have several options for searching using the search term. After triggering the search in this special application, the result is transferred to the project list. Via a query ("Display result directly or include in multiple search?") the user can now decide how to proceed. In the case of direct display, the list of projects is filled directly; in the other case, any further multiple searches are merged with the hits already found. Via the context menu in the selectbtn.png button, the initial state can be restored

: industrial plantVia the selectbtn.png opens the selection window of the industrial plants. After you have selected a plant, cost units with this plant are searched for directly and displayed in the list.
Classification-
: categoryA category can be selected with the button selectbtn.png can be selected. If you want to select the cost units only by this category, click on search.png .
: statusStatuses can be set with the button selectbtn.png can be selected in the list (also several times). (The statuses displayed in the list are sorted according to their respective identification number , i.e. the order can be changed by maintaining this ID correctly).
If you only want to select the cost units according to the selected statuses, click on search.png .
Partner-
: Commercial agentSearch for the agent. With the button selectbtn.png you can select whether you want to search for the commercial, technical or processing person. Now the person can be selected. If you only want to select the cost units with the person in the relevant function, click on search.png .
: GP: customerSearch for the business partner. With the button selectbtn.png you can select whether to search for a customer, interested party, operator (by company role) or directly for a company. Now the partner can be selected. If you want to select the cost units only according to this business partner, click on search.png .
: OP: OperatorSearch for the operating partner. With the button selectbtn.png you can select whether you are looking for an interested party or an operator. Now the partner can be selected. If you want to select the cost units only according to this operative partner, click on search.png .
: search termThe search term is used to display all cost units that have saved the search term as a partner, business partner or operational partner.
Date-
: CreatedSearch for cost objects created on a specific date or date range.
: StartSearch for cost objects that are to start or have been started on a specific date or date range.
: EndSearch for cost objects that are to be or have been closed on a specific date or date range.
Type-
: without/with orderSelect only cost units that have a sales order as successor or not.

Buttons
buttonDescription
BackThe window is closed
SelectThe selected insurance provider(s) will be covered.

Option window

Here you can make settings for the behaviour of the module.

Menu
Menu itemDescription
Edit -
: Set default settingsAll settings are reset

Fields
FieldDescription
List options
Search options-
: Immediate take over in case of a hitIf only one cost unit is found during a search, this is opened in the input window
Clear the list before starting a new searchThe list is cleared before each new search
If there are less than 100 cost units, then display directlyIf there are less than 100 cost units when you call up the list/selection window, they are immediately displayed in the list
: General SearchUse search terms from the cost unit itself
Advanced searchSearch terms of the other roles of the cost unit are taken into account
Validity -
: With exchange objectIf an invalid object has a valid exchange object, only the valid exchange object is displayed (default setting)
: Without exchange objectAny existing exchange objects are ignored, only the original object is listed. If this original object is invalid, it will only be listed if the list of invalid objects (selection: All objects) was selected in the further option
: Only valid objectsOnly valid objects are listed (default)
: All objectsValid and invalid objects are listed
Number of objectsDetermines the maximum number of objects in the list that can be displayed during a search
: All objectsAll objects are listed
: Number of objectsThe number of objects to be listed can be specified manually
: 100 objectsA maximum of 100 objects are listed
: Display mode-
: : Normal
: : Extended
: : With documents
: Presetting the cursor -
: : Number field
: : search term

Buttons
buttonDescription
BackThe window is closed
ApplySettings are saved and the window is closed

Related topics


Technical documentation

Sales cost object provider module

Module name

cxSalesCostObjective.mod

Classes

CX_SALES_COST_OBJECTIVE

Security

In addition to restricting access rights via the class and its data fields, the module can be restricted in its use via some of the received messages.

Received messages
MessageParametersFunctionSecurity
SALES_COST_OBJECTIVE_CHANGEDSales cost objectSales cost object has been changed
SALES_COST_OBJECTIVE_CREATEDSales cost objectSales cost object was created
SALES_COST_OBJECTIVE_DELETEDSales cost objectSales cost object has been deleted
LIMIT_SET

Sent messages
MessageParametersFunctionReceiver module
EDIT_SALES_COST_OBJECTIVENULL or sales cost objectCall up the input window for sales cost objectsSales cost object editing app
SET_LIMIT

Sales cost object editing app

Module name

salesCostObjectiveEdit.app

Classes

CX_SALES_COST_OBJECTIVE

Security

In addition to restricting access rights via the class and its data fields, the module can be restricted in its use via some of the received messages.

Received messages
MessageParametersFunctionSecurity
SALES_COST_OBJECTIVE_CHANGEDSales cost objectSales cost object has been changed
SALES_COST_OBJECTIVE_CREATEDSales cost objectSales cost object was created
SALES_COST_OBJECTIVE_DELETEDSales cost objectSales cost object has been deleted
EDIT_SALES_COST_OBJECTIVENULL or sales cost objectCall up input window for sales cost object
EXPORT_SALES_COST_OBJECTIVE_BALANCE
GET_SALES_COST_OBJECTIVE
LIMIT_SET
LOAD_SALES_COST_OBJECTIVE Import sales cost objective

Sent messages
MessageParametersFunctionReceiver module
SALES_COST_OBJECTIVE_CHANGEDSales cost objectSales cost object has been changed
SALES_COST_OBJECTIVE_CREATEDSales cost objectSales cost object was created
SALES_COST_OBJECTIVE_DELETEDSales cost objectSales cost object has been deleted
SALES_COST_OBJECTIVE_SELECTEDSales cost object, receiverSales cost object was selected
EDIT_SALES_COST_OBJECTIVENULL or sales cost objectCall up the input window for sales cost objectsSales cost object editing app
EDIT_PROCEEDINGSNULL or operation objectCall up the input window for operationsProcess Editing Module
EDIT_VALIDITY_BY_DATE
LIST_SALES_COST_OBJECTIVE Call up list window for cost unitsSales cost object list app
SELECT_COSTS_BALANCES
SET_LIMIT
SHOW_PREVIEWWidgetPrint PreviewPrint Preview

Sales cost object list app

Module name

salesCostObjectiveList.app

Classes

CX_SALES_COST_OBJECTIVE

Security

In addition to restricting access rights via the class and its data fields, the module can be restricted in its use via some of the received messages.

Received messages
MessageParameterFunctionSecurity
SALES_COST_OBJECTIVE_CHANGEDSales cost objectSales cost object has been changed
SALES_COST_OBJECTIVE_CREATEDSales cost objectiveSales cost object was created
SALES_COST_OBJECTIVE_DELETEDSales cost objectiveSales cost object has been deleted
LIMIT_SET
LIST_SALES_COST_OBJECTIVENULL or collection of sales cost objectsCall up list window for sales cost objectives

Sent messages
MessageParametersFunctionReceive module
EDIT_SALES_COST_OBJECTIVENULL or sales cost objectCall up input window for sales cost objectsSales cost object editing app
SET_LIMIT

Sales cost carrier selection app

Module name

salesCostObjectiveSelect.app

Classes

CX_SALES_COST_OBJECTIVE

Security

In addition to restricting access rights via the class and its data fields, the module can be restricted in its use via some of the received messages.

Received messages
MessageParametersFunctionSecurity
SALES_COST_OBJECTIVE_CHANGEDSales cost objectSales cost object has been changed
SALES_COST_OBJECTIVE_CREATEDSales cost objectSales cost object was created
SALES_COST_OBJECTIVE_DELETEDSales cost objectSales cost object has been deleted
LIMIT_SET
SELECT_SALES_COST_OBJECTIVECollection sales cost object or NULL, receiver of response.Call up selection window for sales cost object.

Sent messages
MessageParametersFunctionReceiver module
SALES_COST_OBJECTIVE_SELECTEDSales cost object, receiverSales cost object was selected
EDIT_SALES_COST_OBJECTIVENULL or sales cost objectCall up the input window for sales cost objectsSales cost object editing app
SET_LIMIT

Operational business